Advanced Manufacturing Project

Building area 24,500m2

Contract period 2016 – 2017

Project value £25m

 

Magna BDW Technologies International are a leading global automotive supplier. Appointed in early 2016, Bond Bryan provided full architectural services for the creation of this new aluminium foundry on the client’s 9.4-hectare site.

 

The building occupies approximately half of the site, orientated North South as the most economic arrangement for future expansion.  The building’s façades comprise of a precast concrete plinth at low level with composite panels laid vertically above.  The shipping building is clad using a profiled cladding system.  Vertical glazed panels punctuate the façade and the offices are provided with full height glazing to maximise daylight and views out.

Other projects

University of Nottingham AMB

With a complex brief to adhere to, Bond Bryan were able to create a building both unique in its varying forms and highly significant to its dual functions.

Factory 2050

Factory 2050 is the UK’s first fully reconfigurable assembly and component manufacturing facility for collaborative research.

Contact Us

info@bondbryan.co.uk +44 (0)114 266 2040 Twitter Linkedin Instagram
Legal
website by seismik